September 2008 production

This September has been pretty good as far as MRVC rakes are concerned. 5
rakes were produced in September. The latest being WR’s 5th rake, which was
despatched on 30/09/2008.

Details are available here.

WR rakes page also has been updated with the latest rake.

WR’s older MRVC rakes look shabby now. The first rake desperately needs a
new paint job. The second rake also needs a paint job, but its condition is
not as bad as the first rake. The appearance of the third rake is still
within acceptable limits.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s