News Roundup from the last 2 months

Due to some reason, I was unable to post in the last couple of months. Here is a summary of the important news from this period.

  1. It was proposed that last 10-12 Bombardier rakes should be allotted to CR.
  2. It was discovered that the new air conditioned local cannot run between Churchgate & Dadar on WR. Confusion over where the rake will operate still prevails.
  3. MUTP-3 was sanctioned
  4. Bombardier rake manufacturing continued at a steady pace. 63 have been despatched as of today
  5. CR’s proposal for getting 10-12 Bombardier rakes was not accepted.
  6. Air conditioned rake’s field trials likely to begin in December
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s